Excavation, subgrade preparation and geosynthetics for a PFAS containment cell.

LMI excavated the cell, prepared the subgrade and installed the geosynthetics (GCL, XR5 membrane, protection geotextile and geocomposite). LMI placed 20,000 m³ of PFAS-contaminated material and installed the capping geosynthetics (GCL, black/white LLDPE, cushion geotextile and geocomposite), then placed the soil cover layer and constructed the perimeter drainage swale drains.

What was involved

  • Cell excavation & subgrade preparation
  • GCL
  • XR5 membrane
  • Protection geotextile
  • Geocomposite
  • Placement of 20,000 m³ of PFAS material
  • Capping: GCL, LLDPE, cushion geotextile, geocomposite
  • Soil cover layer
  • Perimeter drainage swale drains