Supply and installation of geosynthetics and leachate pipework for three mine storage dams.

Supply and installation of geosynthetics and leachate pipework across three separate dams - two brine dams with double-layer HDPE and one water dam with single-layer HDPE. Included 80,000 m² of smooth HDPE, single-sided textured HDPE wear liners, GCL, geocomposite, a leak detection system and dam depth indicators.
What was involved
- Three mine storage dams (2 brine, 1 water)
- Smooth HDPE (80,000 m²)
- Single-sided textured HDPE wear liner
- GCL
- Geocomposite
- Leak detection system
- Dam depth indicators
- Leachate pipework