Calibre Estate - Bio-Retention Basin

Construction of a bio-retention basin, including excavation, HDPE lining and stormwater connection.

Clearing and grubbing of batter and trench line; excavation of the bio-retention basin; pond base preparation and removal of unsuitable materials; cut and backfill of the HDPE anchor trench; supply and installation of 1.5 mm HDPE membrane mechanically fixed to the sandstone wall; installation of pipework and pits; connection to the existing bio-retention basin; and supply and installation of bio-retention media to specification.

What was involved

  • Clearing & grubbing
  • Bio-retention basin excavation
  • Pond base preparation
  • HDPE anchor trench cut & backfill
  • 1.5 mm HDPE membrane, mechanically fixed
  • Pipework & pits
  • Connection to existing basin
  • Bio-retention media supply & install